Services
Fourteen services, four situations.
Pick the situation you are in. Every service ends with a finding, not a checklist.
You are taking over or moving into a property
Handover, warranty and tenancy. Document it now, or pay for it later.
- 01
Handover inspection and snagging
Inspection of the new unit before you accept the keys.
ROOM 1/7 · Δ LEVEL 3 mm/m · SNAGS 23 - 02
Re-inspection before the warranty expires
A systematic review before the Defect Liability Period ends.
DLP · DAY 341/365 · OPEN ITEMS 9 - 03
Move‑in and move‑out inspection for tenants and landlords
Condition documentation that protects the deposit and makes the handover smooth.
MOVE-IN · PHOTOS 214 · RH 58 %
You are buying, investing or selling
Know what you are buying before the transfer, not after it. And know the condition of what you are selling.
- 04
Technical advice before purchase
Assessment of an existing property before you buy.
PRE-PURCHASE · RISK 2/5 · CAPEX 5 Y - 05
Technical due diligence
Technical review of assets or small portfolios before you invest.
TDD · UNITS 12 · PRIORITY A/B/C - 06
Independent second opinion
Review of third-party reports, quotations and remediation proposals.
QUOTE AED 48,500 · SCOPE ? · CAUSE ? - 07
Inspected property: condition report before the sale
A systematic record of the property, room by room, before you sell.
PRE-SALE · ROOMS 7/7 · RH 54 %
You have a problem or a renovation
Water on the wall, a crack that keeps growing, mould behind a cupboard, or a fit-out that has to be right before the tiles go on. First the cause, then the repair.
- 08
Building defect analysis and expert reports
Establishing the cause of cracks, leaks, moisture and settlement.
CRACK 0.3 mm · STRUCTURAL ? - 09
Moisture and mould investigation
Find the source, not just the stain.
RH 78 % · AIRFLOW 0.4 m/s · SOURCE ? - 10
Indoor air quality and suspected contaminants
When the air in your home does not feel right.
CO₂ 1,240 ppm · RH 71 % · SAMPLE LAB - 11
Condition survey to define the scope of remediation
What actually has to be remediated, before quotations are obtained.
SCOPE · AREA 42 m² · RH 83 % - 12
Construction‑phase quality control
Independent quality control at selected points during the works, above all where things will later be hidden.
STAGE 3/6 · WATERPROOFING ✓ · TILING ⏳
You own or let a property
Regular checks of an existing property and inspections during a tenancy. Found early, a small finding stays small.